EDG Architecture + Engineering

58 West 40th St, 5th Fl. New York, NY, 10018

(212) 683-5680

info@edgnyc.com

Tower Garage

2009

  • Overview
  • Approach
  • Impact
  • Related

All Projects

OVERVIEW

Beneath an 18-story residential tower, a neglected two-level parking garage required an extensive repair program and a study of faster vehicle access.

EDG developed the repair program and assessed whether one of the building's elevators could be replaced with a vehicular ramp, giving the garage operator quicker access between levels.

BY THE NUMBERS

  • Project Value $1,500,000
  • Year Completed 2009

APPROACH

Brought in after the client had already received bids, EDG re-evaluated the repair design to find the most effective method and products.

Comparing full replacement against patch repairs showed that replacing the entire concrete topside was the better solution. For the new ramp, EDG used precise survey data to fit the ramp within inches of the existing structure.

IMPACT

Full topside replacement saved nearly $400,000 over patch repairs, and the complete scope cost the same as the original patch-only bid.

That scope also included the new ramp and sidewalk waterproofing. The ramp significantly increased the value of the garage for its operator, paying for itself in about a year and a half.


Please rotate your device

For the best experience, turn
your phone upright.