Motorgate Parking Structure
EDG Architecture + Engineering
58 West 40th St, 5th Fl. New York, NY, 10018
Sign up
Roosevelt Island
Brutalist-style Motorgate Parking Structure on Roosevelt Island, featuring exposed concrete beams and multiple parking levels.
OVERVIEW
Motorgate is Roosevelt Island's central parking facility: an eight-level, 240,000-square-foot precast concrete parking structure with roughly 2,000 spaces, open 24 hours a day.
Decades of road salt had deteriorated its slabs, tee-beam deck, stairs and façades, and failed drains let water through to the floors below. GRC Management retained EDG to carry a parking garage restoration from condition assessment through bidding and construction, with Local Law 126 parking structure inspection requirements in view. The parking garage repair scope covered concrete slab, tee-beam and stair repairs, joint sealing, new drains, and parking garage waterproofing with a traffic-bearing roof deck membrane.
Motorgate Parking Structure on Roosevelt Island, viewed from across the East River, showcasing its brutalist concrete design.
Cherry blossom tree in full bloom along the East River waterfront, with the Roosevelt Island Bridge and city skyline in the background.
APPROACH
Probes at the tee-beam joints revealed that the steel plates and reinforcement tying the precast tees together had been cut, a condition no surface survey would have found. EDG specified a structural shear-connector retrofit at 480 joints, plus carbon-fiber strengthening as conditions were uncovered. After competitive bidding and leveling, work was phased in 15,000-square-foot sections so parking stayed in service. EDG carried the project through DOB approval, sidewalk shed renewals and close-out in early 2023, and gave the owner a memo on remaining conditions to budget for ahead of the first Local Law 126 inspection cycle.
Brutalist-style concrete facade of the Motorgate Parking Garage on Roosevelt Island, showcasing geometric architectural design.
IMPACT
The parking garage restoration returned a structurally sound, watertight deck without taking parking offline: Motorgate stayed open 24 hours a day throughout construction. The base scope was delivered for approximately $1.5 million, in line with the leveled bids, and the new roof deck waterproofing, drains and joint sealing stopped the water infiltration driving deterioration below. The joint retrofit resolved a hidden structural deficiency that would otherwise have spread undetected. With the first Local Law 126 inspection report due in 2025, the owner has a repaired parking structure and a prioritized list of remaining items, so compliance can be planned, not rushed.