EDG Architecture + Engineering
58 West 40th St, 5th Fl. New York, NY, 10018
Sign up
2012
OVERVIEW
For Kidville, a national early-learning and daycare provider, EDG delivered engineering, code compliance and facade restoration services across three New York City locations.
EDG's architectural team completed gut renovations at each Kidville location, implementing new elevator and stair cores, extensive alterations, a new mezzanine, and a building addition. EDG made a full replacement of the landmarked façade at 466 Columbus Avenue, Kidville's former Upper West Side location.
APPROACH
EDG's structural engineering team re-examined a pile foundation system already designed for the building addition, testing whether it was needed at all.
New piles would have extended the schedule and pushed the project well over budget. EDG's analysis showed that replacing the heavy brick masonry ground floor with a lightweight wood-framed floor would reduce loads enough to support a building addition on the existing foundations.
IMPACT
Eliminating the pile foundations saved an estimated $500,000 for the client and allowed the building addition to proceed without any foundation reinforcement.
The lighter structure avoided the delays and cost of new foundation work while giving Kidville the additional space the expansion called for.