OVERVIEW
The District Attorney’s Office required a modern crime lab to meet the stringent demands of forensic investigations while integrating seamlessly with existing operations.
They turned to EDG Architecture + Engineering for a comprehensive solution, from initial planning and design to cost estimation, filing, and construction administration. The project encompassed a 21,000-square-foot facility that would house state-of-the-art laboratory spaces and include essential support areas for the office and staff. This initiative was a critical step in enhancing the precision and efficiency of the city’s criminal justice system while creating a space future-proofed for ever-evolving technologies.