Montauk Manor

2016-03-29

Montauk Manor Restorations

Scope

EDG was selected for the façade restoration and roof waterproofing program for Montauk Manor, which began in 2008. This historic resort condominium hotel is the largest and tallest building in Montauk. It was built in 1926 by Carl G. Fisher and is a four-story, 200-room hotel in the Tudor Revival style. The building is exposed to extreme weather conditions due to its location on the Long Island Sound, where salt water from the ocean rapidly accelerates the deterioration of the façade and roof.

Approach

Investigation is always the first step to a successful restoration project. This includes performing careful due diligence to obtain all of the available information on the construction of the façade as well as the history of repairs. If we don’t have a clear picture, we probe prior to or during construction to determine the conditions. Proper repairs and waterproofing can only be designed when there is a thorough understanding of the existing construction.

Impact

We worked closely with the contractor for repairs so there were no surprises in material selection or cost, which was essential for performing the work within budget. Our experts are trained to work with contractors and collect feedback to ensure constructability. We continue to provide façade repair design and detailing for dozens of unique façade conditions, keeping the Manor free of leaks and maintaining the longevity of the Landmark.